- Submit Request
- Campus Maps
- Directory of buildings
- Academic Quadrangle
- Alcan Aquatic Research Centre
- Applied Sciences Building
- Bee Research Building
- Beedie Field Concession
- Biology Trailer
- Blusson Hall
- Childcare Centre 1,2,3 &4 Office
- Convocation Mall
- Conerstone
- Diamond Alumni Centre
- Discovery 1
- Discovery 2
- East Concourse Cafeteria
- East Theatre Annex
- Education Building
- Facilities Services
- Fire Pump Station
- Greenhouses 1,2,3 & 5
- Halpern Centre
- High Voltage Substation
- Leslie & Gordon Diamond Family Auditorium
- LDC Stadium
- Lorne Davies Complex
- Maggie Benston Centre
- Robert C. Brown Hall
- Saywell Hall
- Service Station
- Shrum Science Centre Biology
- Shrum Science Centre Chemistry
- Shrum Science Centre Kinesiology
- Shrum Science Centre Physics
- South East Classroom Block
- South Sciences Building
- Science Research Annex
- Strand Hall
- Student Union Building
- Technology & Science Complex 1
- Technology & Science Complex 2
- The Water Tower Building
- Trottier Observatory
- Transportation Centre
- Transit Loop Building
- W.A.C. Bennett Library
- Water Tower
- West Mall Centre
- West Parkade
- Winter Operations Building
- Barbara Rae House
- Dining Commons
- Hamilton Hall
- Mctaggart Cowan Hall
- Pauline Jewett House
- Shadbolt House
- Shell House Residence
- Townhouses (Total 9 buildings)
- Residence Phase1 East
- Residence Phase1 West
- University-Childcare-Centre
- Building & Infrastructure Records
- Key Plans
- Mapping Services
- Directory of buildings
- Projects & Initiatives
- Construction Projects
- REDI Initiatives
- Sustainable Initiatives
- Health and Safety Initiatives
- Contractors
- ¶¡ÏãÔ°AV Owner's Technical Requirements
- Services
- Building Renovations, Renewals or Modernizations
- Building Signage Requests
- Confidential Shredding
- Custodial Services
- Event Setup
- Filming on Campus
- Furniture & Equipment Removal
- HVAC and Room Occupancy Schedule Changes
- Mail & Parcel Services
- Maintenance Requests
- Minor Building Alterations & Equipment Installations
- Moving Services
- Office Supplies
- Recycling Services
- Snow and Ice Removal Services
- Space Inventory Management
- Real Estate
- About
- Contact Us
- Senior Management Team
- Administration and Real Estate Services
- Campus Planning & Development
- Maintenance and Operations
- Awards & Achievements
- News
- Renovated Diamond Alumni Centre now open for bookings
- ¶¡ÏãÔ°AV unveils plans for new student housing and child care centre
- ¶¡ÏãÔ°AV School of Medicine moves forward
- Adjustments to cleaning services – What you need to know
- Flushing Repair Costs Down the Drain
- New improvements to tackle snow at ¶¡ÏãÔ°AV
- Engineer Breaks Down Gender Barriers and ¶¡ÏãÔ°AV's Energy Emissions
- One Small Change Leads to Sustainable Reduction in Paper Usage by 90 Per Cent for Important ¶¡ÏãÔ°AV Workflow
- Burnaby Campus Biomass Facility Celebrates 2nd Year Anniversary After Smashing Renewable Energy Records
Burnaby Campus
Shrum Chemistry Renewal (2011) - Achieved LEED® Canada Gold
Despite tight schedules and budget, the chemistry wing renewal project has an entirely new building envelope with seismic upgrades, new heating, ventilation and air-conditioning systems, upgraded mechanical and electrical systems, and redesigned lab areas. As a result of the rebuild, the university's five main chemistry research streams - synthetic, organic, inorganic, analytical and physical - now each share one large lab per research stream, facilitating future flexibility.
This project has achieved the LEED Gold or New Construction and Major Renovations. for more information.
Lorne Davies Complex (2006)
The 40,000 square foot gymnasium expansion at ¶¡ÏãÔ°AV includes a gym with large spectator seating areas and a two-level fitness centre. The mechanical heating, cooling and ventilation systems for the new building were designed to maximize flexibility, occupant comfort and energy efficiency.
for more information.
Saywell Hall (2007)
The 7,500 square metre building will house a new forensic centre for training and research as well as the archeology and criminology departments and First Nations studies. In addition, the ¶¡ÏãÔ°AV psychology clinic will move in from the East Annex building.
for more information.
Technology and Sciences Complex 1 (2005)
The 9,664 square metre three-storey TASC 1 (Technology and Sciences Complex 1) Building is the first building in the development of an expanded Science precinct on the south side of the campus. The design incorporates a generic, modular, flexible approach to the building layout and services.
for more information.
Technology And Sciences Complex 2 (2006)
A new 12,670 square metre wet/dry laboratory building designed for a range of research activities with support office space including 20,700 square foot s highly specialized research laboratory. The design incorporates a generic, modular, highly flexible approach to the building layout and services. The building is also designed to fit into the campus pedestrian network system, and includes two major public spaces which provide naturally lit transition and gathering spaces.
for more information.