- Submit Request
- Campus Maps
- Directory of buildings
- Academic Quadrangle
- Alcan Aquatic Research Centre
- Applied Sciences Building
- Bee Research Building
- Beedie Field Concession
- Biology Trailer
- Blusson Hall
- Childcare Centre 1,2,3 &4 Office
- Convocation Mall
- Conerstone
- Diamond Alumni Centre
- Discovery 1
- Discovery 2
- East Concourse Cafeteria
- East Theatre Annex
- Education Building
- Facilities Services
- Fire Pump Station
- Greenhouses 1,2,3 & 5
- Halpern Centre
- High Voltage Substation
- Leslie & Gordon Diamond Family Auditorium
- LDC Stadium
- Lorne Davies Complex
- Maggie Benston Centre
- Robert C. Brown Hall
- Saywell Hall
- Service Station
- Shrum Science Centre Biology
- Shrum Science Centre Chemistry
- Shrum Science Centre Kinesiology
- Shrum Science Centre Physics
- South East Classroom Block
- South Sciences Building
- Science Research Annex
- Strand Hall
- Student Union Building
- Technology & Science Complex 1
- Technology & Science Complex 2
- The Water Tower Building
- Trottier Observatory
- Transportation Centre
- Transit Loop Building
- W.A.C. Bennett Library
- Water Tower
- West Mall Centre
- West Parkade
- Winter Operations Building
- Barbara Rae House
- Dining Commons
- Hamilton Hall
- Mctaggart Cowan Hall
- Pauline Jewett House
- Shadbolt House
- Shell House Residence
- Townhouses (Total 9 buildings)
- Residence Phase1 East
- Residence Phase1 West
- University-Childcare-Centre
- Building & Infrastructure Records
- Key Plans
- Mapping Services
- Directory of buildings
- Projects & Initiatives
- Construction Projects
- REDI Initiatives
- Sustainable Initiatives
- Health and Safety Initiatives
- Contractors
- 間眅埶AV Owner's Technical Requirements
- Services
- Building Renovations, Renewals or Modernizations
- Building Signage Requests
- Confidential Shredding
- Custodial Services
- Event Setup
- Filming on Campus
- Furniture & Equipment Removal
- HVAC and Room Occupancy Schedule Changes
- Mail & Parcel Services
- Maintenance Requests
- Minor Building Alterations & Equipment Installations
- Moving Services
- Office Supplies
- Recycling Services
- Snow and Ice Removal Services
- Space Inventory Management
- Real Estate
- About
- Contact Us
- Senior Management Team
- Administration and Real Estate Services
- Campus Planning & Development
- Maintenance and Operations
- Awards & Achievements
- News
- Renovated Diamond Alumni Centre now open for bookings
- 間眅埶AV unveils plans for new student housing and child care centre
- 間眅埶AV School of Medicine moves forward
- Adjustments to cleaning services What you need to know
- Flushing Repair Costs Down the Drain
- New improvements to tackle snow at 間眅埶AV
- Engineer Breaks Down Gender Barriers and 間眅埶AV's Energy Emissions
- One Small Change Leads to Sustainable Reduction in Paper Usage by 90 Per Cent for Important 間眅埶AV Workflow
- Burnaby Campus Biomass Facility Celebrates 2nd Year Anniversary After Smashing Renewable Energy Records
Burnaby Campus Biomass Facility Celebrates 2nd Year Anniversary After Smashing Renewable Energy Records
Having forgone in-person milestone celebrations like our grand opening and first anniversary during the pandemic, the Burnaby Mountain District Energy Utility (BMDEU), a collaboration between 間眅埶AV (間眅埶AV), 間眅埶AV Community Trust and Corix Utilities, finally celebrated our second anniversary this past October alongside 35 plus consulting, trade and contracting companies who contributed to the creation of the project.
Greenhouse gas (GHG) emissions reduction as a goal
I think its important to emphasize just how much the biomass energy centre aligns and contributes to 間眅埶AVs sustainability and our mutual goals of making a difference when it comes to GHG emissions reductions, says Todd Gattinger, director of maintenance and operations at Facilities Services on the collaboration with Corix Utilities and building the biomass energy centre.
So far, things are looking good. The biomass energy centre has reduced 間眅埶AVs Burnaby campus carbon footprint by 85 per cent (or 11,600 tCO2e annually).
With the help of the biomass energy centre, 間眅埶AV has exceeded its provincially-mandated goal - a 40 per cent reduction of GHG emissions by 2025 years ahead of schedule.
Read more about how we exceeded this goal.
How it started
Located on 8500 South Campus Road, the BMDEU has been providing heat and hot water to both Burnaby campus and UniverCity for over two years.
When a biomass energy centre was envisioned for Burnaby Mountain, 間眅埶AV was immediately interested in improving our district energy utility system by adding this renewable carbon neutral energy source.
This huge undertaking started with a feasibility study for a thermal energy solution for 間眅埶AV and UniverCity in 2009, resulting in the Biomass Thermal Energy Project agreement formed between Corix Utilities and 間眅埶AV in 2017.
With the formal agreement signed, design and construction proceeded with the first flame lit in October 2020.
Learn more about how the BMDEU diverts wood waste from landfills to help reduce greenhouse gas emissions in our FAQs.
Building greener buildings
One of the ways 間眅埶AV reduces emissions is being smarter with construction projects on campus. With the Applied Sciences Buildings recent renewal, the existing boiler remains as a backup. Now the entire building is serviced by the biomass energy centre and runs on renewable energy.
Learn more about the many ways 間眅埶AV is reducing emissions in our 2021 Climate Change Accountability Report.