- Submit Request
- Campus Maps
- Directory of buildings
- Academic Quadrangle
- Alcan Aquatic Research Centre
- Applied Sciences Building
- Bee Research Building
- Beedie Field Concession
- Biology Trailer
- Blusson Hall
- Childcare Centre 1,2,3 &4 Office
- Convocation Mall
- Conerstone
- Diamond Alumni Centre
- Discovery 1
- Discovery 2
- East Concourse Cafeteria
- East Theatre Annex
- Education Building
- Facilities Services
- Fire Pump Station
- Greenhouses 1,2,3 & 5
- Halpern Centre
- High Voltage Substation
- Leslie & Gordon Diamond Family Auditorium
- LDC Stadium
- Lorne Davies Complex
- Maggie Benston Centre
- Robert C. Brown Hall
- Saywell Hall
- Service Station
- Shrum Science Centre Biology
- Shrum Science Centre Chemistry
- Shrum Science Centre Kinesiology
- Shrum Science Centre Physics
- South East Classroom Block
- South Sciences Building
- Science Research Annex
- Strand Hall
- Student Union Building
- Technology & Science Complex 1
- Technology & Science Complex 2
- The Water Tower Building
- Trottier Observatory
- Transportation Centre
- Transit Loop Building
- W.A.C. Bennett Library
- Water Tower
- West Mall Centre
- West Parkade
- Winter Operations Building
- Barbara Rae House
- Dining Commons
- Hamilton Hall
- Mctaggart Cowan Hall
- Pauline Jewett House
- Shadbolt House
- Shell House Residence
- Townhouses (Total 9 buildings)
- Residence Phase1 East
- Residence Phase1 West
- University-Childcare-Centre
- Building & Infrastructure Records
- Key Plans
- Mapping Services
- Directory of buildings
- Projects & Initiatives
- Construction Projects
- REDI Initiatives
- Sustainable Initiatives
- Health and Safety Initiatives
- Contractors
- ¶¡ÏãÔ°AV Owner's Technical Requirements
- Services
- Building Renovations, Renewals or Modernizations
- Building Signage Requests
- Confidential Shredding
- Custodial Services
- Event Setup
- Filming on Campus
- Furniture & Equipment Removal
- HVAC and Room Occupancy Schedule Changes
- Mail & Parcel Services
- Maintenance Requests
- Minor Building Alterations & Equipment Installations
- Moving Services
- Office Supplies
- Recycling Services
- Snow and Ice Removal Services
- Space Inventory Management
- Real Estate
- About
- Contact Us
- Senior Management Team
- Administration and Real Estate Services
- Campus Planning & Development
- Maintenance and Operations
- Awards & Achievements
- News
- Renovated Diamond Alumni Centre now open for bookings
- ¶¡ÏãÔ°AV unveils plans for new student housing and child care centre
- ¶¡ÏãÔ°AV School of Medicine moves forward
- Adjustments to cleaning services – What you need to know
- Flushing Repair Costs Down the Drain
- New improvements to tackle snow at ¶¡ÏãÔ°AV
- Engineer Breaks Down Gender Barriers and ¶¡ÏãÔ°AV's Energy Emissions
- One Small Change Leads to Sustainable Reduction in Paper Usage by 90 Per Cent for Important ¶¡ÏãÔ°AV Workflow
- Burnaby Campus Biomass Facility Celebrates 2nd Year Anniversary After Smashing Renewable Energy Records
Fall Protection
According to the Occupational Health and Safety Regulation, a fall protection system must be used when work is being done at a place from which a fall of 3 metres (10 feet) or more may occur, or where a fall from a height of less than 3 metres involves a risk of injury greater than the risk of injury from the impact on a flat surface.
There are several different types of fall protection systems, each with varying degrees of effectiveness. Guardrails are considered the best option for fall protection, followed by a fall restraint system, then a fall arrest system, and finally, the implementation of work procedures, which is considered the least desirable option. A control zone with a safety monitor is an example of an acceptable work procedure.
Equipment used for a fall protection system must be sufficient to support the fall restraint or arrest forces. It must also consist of compatible and suitable components, and be used in accordance with applicable standards.
Before a worker is allowed into an area where a risk of falling exists, they must be instructed in the fall protection system for the area and the procedures to be followed.
Roof access
Please contact EHS for a copy of the Roof Access Manual for directions on accessing the various building rooftops and terrace plateaus at the Burnaby campus.
Contractors
Prior to commencing work at ¶¡ÏãÔ°AV, contractors who will be working at heights must complete the ¶¡ÏãÔ°AV Fall Protection Work Plan form and submit it along with their Fall Protection Plan to the Department of Environmental Health and Safety (EHS) for review. EHS will not approve the plan but will review the plan to ensure that it is complete and has been tailored to the work being conducted at ¶¡ÏãÔ°AV.